Warranty: | 1 Year |
---|---|
Condition: | New |
Voltage: | Matched |
Dimension(L*W*H): | Matched |
Showroom Location: | Canada, United States, India |
Weight: | 500 Kg |
Customization: |
---|
Suppliers with verified business licenses
used craft brewery beer making equipment for brewing lighting beer
Ø Stainless steel 304 or 316 material for all the tanks, valves, piplines.
Ø 2-5 vessels for option, maximum 6-8 brews.
Ø Mash Tun+Lauter Tun+Brew Kettle+ Whirlpool Tank+HLT(Wort Holding Tank option).
Ø Steam jacket system at the side and bottom of each vessel, separate control.
Ø VFD motor(SEW), Sanitary Centrifugal Pump(ABB).
Ø Grist Hydrator, Glass manways, Glass wort grant.
Ø Dedicated brew kettle, IFM flow meter.
Ø Perforated Platform and Stairs.
Ø PLC control system, Stainless Steel Cabinet on the platform.
Ø Pneumatic valve Automatic control or Semi-automatic control.
1) Fully insulated mash tun and brew kettle mounted on a modular, radius edge, stainless steel under-frame, designed for easy and efficientinstallation in almost any structure.
2) 100% certified 304L sanitary food grade stainless steel in all of our components. Zero mild steel in our brewhouse, kettles or brew deck.
3) A Mash out manway and true Vee-Wire False Bottom for rapid and efficient cleanup.
4) A Design that allows infinite control, endless flexibility and precise repetition.
5) All necessary equipment to monitor the quality of the brew.
6)Steam, Electric or Direct Fire for heating.
Any other queation, contact with me without hesitation!
Q:What size of building do I need?
For a brewpub, size depends on a lot your yearly volume and how many different types of beer you want to brew.The minimum area request is around 20m^2.There are also estimated area requests in our different brewery systems in specification above.
For microbreweries the main factor is yearly volume.For small microbreweries, floor space of 300m^2 usually is enough .
About details on your project,we can give you exact dimensions and requirements.
Q:What utilities do I need for a brewery?
Typically water,electricity and drains are needed.
In general, 3 phase electricity is common and suitable for 220/380/440 voltage with 50/60Hz.The size of the water connection is determined by the size of
For brewery project we provide our customers with detailed requirement on the utilities and their respective location.
Q:Not being a brewer, can i start a brewery?
Yes! There are not so many brewers. Cassman can help you or one of your employees learning how to brew, including familiarizing you with operating brewery equipment, stuying recipes, grasping quality control and so on.
Above all, Cassman can also offers a wide variety of services such as project planning, layout design, installation, and after sales services etc.
These services are free!
Q:Where can I get my ingredients ?
Almost every country or area can find a supplier for malt,hops,yeast etc. Cassman company can also help to get good quality raw materials here.If you find the ingredients hardly, we can make arrangement to shipped to you.
Q:How long does the equipment last?
Given the fact that most facility in a brewery are made of stainless steel,the longevity of a brewery is long. In a conditon of proper maintenance and the careful use of chemicals,a brewery can be used intensively for about 20 to 30 years.For some equipment, such as fill and label with a lot of moving parts, a shorter lifespan should be considered and more maintenance will be necessary.
In brief, depending on the use.
Packaging : We consider all different potential situation in the delivery, so we use every prevention measures to avoid any potential inconvenience or trouble
a.Bulk cargo: Standard wooden case which can avoid any clash during the sea or air transportation in case of
causing damage to the surface of our products.
b.Container cargo: the equipment will be bound firmly and won't easily swing to the side, or up, or down.
Shipping: Deliver from Qingdao port within 30-45 days
1. Pre-sale service:
According to customer requirements to provide one-stop brewing beer project solution: tailored process flow chart; site layout; cost-benefit analysis.
2. Production monitoring:
Equipment production will be strictly according to standards, timely communication with the customer production and other production conditions; to guide customers to prepare the venue; to help customers handle the relevant permit business procedures; equipment acceptance after the completion of timely and accurate delivery, contact The logistics do a good job Shipping matters.
3. After-sales service:
Our commitment to all tanks two-year warranty, life-long technical support. And send professional brewing engineers free on-site guidance to install debugging; to teach brewing beer brewing technology; provide a variety of brewing brewing formula; supply all kinds of beer Brewing raw materials.
Suppliers with verified business licenses